Picture Gallery Contents
| 12 Jan 99 | stripping LAD |
| 18 Jan 99 | stripping LAD |
| 28 Jan 99 | removing LAD |
| 16 Feb 99 | GEM beamstop |
| 1 Mar 99 | beamline |
| 29 Mar 99 | tank & beamline |
| 15 Apr 99 | tank & beamline |
| 27 Apr 99 | detector & electronics |
| 28 Apr 99 | GSAC inspect GEM |
| 23 Jun 99 | tank in place |
| 22 Jul 99 | detector frame |
| 6 Aug 99 | detector modules |
| 13 Aug 99 | tank & beamline |
| 2 Sep 99 | roof |
| 22 Sep 99 | in-tank shielding etc |
| 24 Sep 99 | detectors, shielding |
| 28 Sep 99 | detector installation |
| 4 Oct 99 | detector installation |
| Engineers | inspection of work |
| 8 Oct 99 | assembling GEM |
| 11 Oct 99 | GEM takes shape |
| 12 Oct 99 | last minute prep |
| 17 Dec 99 | temporary monitor |
| 22 Dec 99 | beam profiler |
| 23 Feb 00 | bank 6 phase 1 |
| 3 Jul 00 | bank 6 installation |
| 17 May 01 | bank 1 testing |
| 20 Jun 01 | bank 1 light-tight |
| 26 Jun 01 | bank 1 installation |
| 29 Jun 01 | bank 1 installed |
| 9 Aug 01 | ORC arrives |
| 18 Oct 01 | collimator work |
| 23 Dec 01 | bank4 assembly |
| 17 Apr 02 | beam scraper test |
| 22 Apr 02 | making collimation |
| 24 Apr 02 | low angle region |
| 14 May 02 | bank3 develops |
| 17 May 02 | views of bank6 |
| 7 Jun 02 | ORC drive demo |
| 14 Jun 02 | bank4 installed |
| 20 Jun 02 | ORC rotates! |
| 21 Jun 02 | bank3 begins |
| 2 Jul 02 | bank4 collimation |
| 3 Jul 02 | ORC in tank! |
| 15 Jul 02 | new beam-scraper |
| 25 Feb 03 | 6.5m disc chopper |
| 27 Feb 03 | chopper, Renishaw |
| 11 Mar 03 | furnace test, scraper |
| 25 Mar 03 | 9.75m disc chopper |
| 12 Jun 03 | beam-scraper drawings |
| 18 Jul 03 | Bank5X construction |
| 1 Aug 03 | ORC lifting design |
| 30 Oct 03 | Bank0 is installed |