Picture Gallery Contents

12 Jan 99 stripping LAD
18 Jan 99 stripping LAD
28 Jan 99 removing LAD
16 Feb 99 GEM beamstop
1 Mar 99 beamline
29 Mar 99 tank & beamline
15 Apr 99 tank & beamline
27 Apr 99 detector & electronics
28 Apr 99 GSAC inspect GEM
23 Jun 99 tank in place
22 Jul 99 detector frame
6 Aug 99 detector modules
13 Aug 99 tank & beamline
2 Sep 99 roof
22 Sep 99 in-tank shielding etc
24 Sep 99 detectors, shielding
28 Sep 99 detector installation
4 Oct 99 detector installation
Engineers inspection of work
8 Oct 99 assembling GEM
11 Oct 99 GEM takes shape
12 Oct 99 last minute prep
17 Dec 99 temporary monitor
22 Dec 99 beam profiler
23 Feb 00 bank 6 phase 1
3 Jul 00 bank 6 installation
17 May 01 bank 1 testing
20 Jun 01 bank 1 light-tight
26 Jun 01 bank 1 installation
29 Jun 01 bank 1 installed
9 Aug 01 ORC arrives
18 Oct 01 collimator work
23 Dec 01 bank4 assembly
17 Apr 02 beam scraper test
22 Apr 02 making collimation
24 Apr 02 low angle region
14 May 02 bank3 develops
17 May 02 views of bank6
7 Jun 02 ORC drive demo
14 Jun 02 bank4 installed
20 Jun 02 ORC rotates!
21 Jun 02 bank3 begins
2 Jul 02 bank4 collimation
3 Jul 02 ORC in tank!
15 Jul 02 new beam-scraper
25 Feb 03 6.5m disc chopper
27 Feb 03 chopper, Renishaw
11 Mar 03 furnace test, scraper
25 Mar 03 9.75m disc chopper
12 Jun 03 beam-scraper drawings
18 Jul 03 Bank5X construction
1 Aug 03 ORC lifting design
30 Oct 03 Bank0 is installed

Back to GEM Main Menu

Number of visits:
Hit Counter