Picture Gallery Contents
12 Jan 99 | stripping LAD |
18 Jan 99 | stripping LAD |
28 Jan 99 | removing LAD |
16 Feb 99 | GEM beamstop |
1 Mar 99 | beamline |
29 Mar 99 | tank & beamline |
15 Apr 99 | tank & beamline |
27 Apr 99 | detector & electronics |
28 Apr 99 | GSAC inspect GEM |
23 Jun 99 | tank in place |
22 Jul 99 | detector frame |
6 Aug 99 | detector modules |
13 Aug 99 | tank & beamline |
2 Sep 99 | roof |
22 Sep 99 | in-tank shielding etc |
24 Sep 99 | detectors, shielding |
28 Sep 99 | detector installation |
4 Oct 99 | detector installation |
Engineers | inspection of work |
8 Oct 99 | assembling GEM |
11 Oct 99 | GEM takes shape |
12 Oct 99 | last minute prep |
17 Dec 99 | temporary monitor |
22 Dec 99 | beam profiler |
23 Feb 00 | bank 6 phase 1 |
3 Jul 00 | bank 6 installation |
17 May 01 | bank 1 testing |
20 Jun 01 | bank 1 light-tight |
26 Jun 01 | bank 1 installation |
29 Jun 01 | bank 1 installed |
9 Aug 01 | ORC arrives |
18 Oct 01 | collimator work |
23 Dec 01 | bank4 assembly |
17 Apr 02 | beam scraper test |
22 Apr 02 | making collimation |
24 Apr 02 | low angle region |
14 May 02 | bank3 develops |
17 May 02 | views of bank6 |
7 Jun 02 | ORC drive demo |
14 Jun 02 | bank4 installed |
20 Jun 02 | ORC rotates! |
21 Jun 02 | bank3 begins |
2 Jul 02 | bank4 collimation |
3 Jul 02 | ORC in tank! |
15 Jul 02 | new beam-scraper |
25 Feb 03 | 6.5m disc chopper |
27 Feb 03 | chopper, Renishaw |
11 Mar 03 | furnace test, scraper |
25 Mar 03 | 9.75m disc chopper |
12 Jun 03 | beam-scraper drawings |
18 Jul 03 | Bank5X construction |
1 Aug 03 | ORC lifting design |
30 Oct 03 | Bank0 is installed |
Number of visits: